Termite Control

Post-Construction
$6/linear ft*

  • Exterior perimeter trench and/or rod treatment

  • Interior where needed

  • Drilling concrete where necessary

  • Termidor SC or Taurus SC Termiticide

  • 1 year retreatment guarantee

    Measured around the exterior perimeter. $250 minimum

Pre-Construction $0.40/sqft*

  • Exterior perimeter

  • Interior perimeter

  • Under concrete slabs

  • Termidor SC or Taurus SC or Premise 75 WP Termiticide

  • 1 year retreatment guarantee

    Measured on base floor only. $250 minimum